![]() ![]() Only when the adjustment 1) Check that the combustion head penetrates into the servo motor has returned to the “switch on”. Ignition phase, ignition controlled Flashing yellow. Operational status During startup, status indication takes place according to the following table: indication Color code table for multicolor signal lamp (LED) Status Color code Color Waiting time «tw», other waiting states. When the burner is running at minimum capacity, if the modulation probe allows, (adjusted to a temperature or pressure value gre- panel are closed. DESCRIPTION OF OPERATION DESCRIPTION OF MODULATION WORKING When the main switch and the I/O switch (2. The regulations further require a switch on the burner’s power sup- ply line, outside the boiler room and in an easily accessed position.įor the electrical connections (line and thermostats), follow the wiring diagram enclosed. WIRING DIAGRAM The three- phase power supply line must have a switch with fuses. ![]() Following the drawing, connect the tube on the attachment on the flange and fix with the screw - Position the seal insulation 3 on the tube unit inserting cord 2 between flange and seal. OVERALL DIMENSIONS 1) Combustion head 2) Gasket 3) Burner attachment flange 4) Combustion Head adjustment device 5) Cover 6) Gas train connector flange 7) Electrical panel 8) Motor 9) Air adjustment servomotor 1. SLC Link Series Power Supply pdf manual download. View and Download Salicru SLC Link Series service manual online.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2022
Categories |